| Resources Information Standards Committee |
|
Standards for Predictive Ecosystem Mapping (PEM) - Digital Data Capture
Predictive Ecosystem Technical Standards and Database Manual Prepared by
April 2000 |
|
This document is also available in Adobe Acrobat PDF format. Click on the icon to view/download. |
Back to Task Force Index
Table of Contents
CIP
Preface
Abstract
Acknowledgments
List of Tables
List of Figures
List of Appendices2 Database Standards and Data Capture
2.1 Background and Scope
2.2 Recording input, project and polygon metadata
2.3 Database Field Definitions For Predictive Ecosystem Data Capture
2.4 PEM Data Attributes3 Check and Presentation Plots
4 Metadata
5 DeliverablesList of Tables
Table 2-1 - Mandatory input, project and polygon metadata required for predictive ecosystem mapping
Table 2-2 - Attributes of the associated thematic input data source RTF
Table 2-3 - Description of attribute fields for each thematic input data source
Table 2-4 - Attributes of the associated knowledge base RTF
Table 2-5 - Descriptions of attribute fields for predictive ecosystem project output data11
Table 2-6 - Attributes of the associated RTF for new 'non-RIC' inventories in support of a PEM project
Table 2-7 - Description of Attribute Fields for Ecosystem Meta Data for new 'non-RIC' inventories in support of a PEM project
Table 2-8 - Example of PEM user defined data
Table 2-9 - Example reporting accuracy assessment of PEM
Table 5-1 - Scale designators used in PEM naming conventionsList of Figures
Figure 1-1 - Generic PEM Process: general steps from requirements analysis to map and report productionsList of Appendices
Appendix A - Project Sign Off - Task Completion ScheduleHTML Created: July 2000
Copyright © 2000 Province of British Columbia
Published by the Resources Inventory Committee